|
Tender Corrigendum :
|
| Tender Corrigendum | Deadline has been changes from Nov 15 2025 12:00AM to Nov 25 2025 12:00AM Date | | Tender Corrigendum Publication | Company Web Site - Internet | | Tender Corrigendum Document | Can be download by Subscribers | | Tender Corrigendum | Deadline has been changes from Nov 12 2025 12:00AM to Nov 15 2025 12:00AM Date | | Tender Corrigendum Publication | Company Web Site - Internet | | Tender Corrigendum Document | Can be download by Subscribers | | Tender Corrigendum | Deadline has been changes from Nov 5 2025 12:00AM to Nov 12 2025 12:00AM Date | | Tender Corrigendum Publication | Company Web Site - Internet | | Tender Corrigendum Document | Can be download by Subscribers |
|
|
Product Detail :
|
Tender Invited For Layer 2 Access Switch (V2) (Q2) , Wireless Access Point (V2) (Q2) , Networking / Server Rack (Q2) , Small Form - Factor Pluggable Transceiver (Q2) , Cat6 4pair UTP cable 305mtr in one box , Cat6 4pair UTP Outdoor cable 305mtr in one box , Information Outlet Cat 6 , Face Plate with Gang box , 1 Meter UTP CAT 6 Patch Cord , 3 Meter UTP CAT 6Patch Cord , 24 Port CAT6 Patch Panel Fully Loaded , Single Mode fiber 24 core Armored UniTube , 12 Port Fibre Optic LIU Fully Loaded , 24 Port Fibre Optic LIU Fully Loaded , Fibre Patch Cord SC-LC SM, Duplex 2 meter , Online UPS 1 KVA with minumum 15 minutes backup , HDPE Pipe 40MM , 105x50mm DLP Raceway with accessories , 80x50mm DLP Raceway with accessories , 32 mm PVC Heavy Conduit with accessories ISI Mark , 40 mm PVC Heavy Casing with accessories ISI Mark , Flexible Pipe 25 40 mm , Laying of UTP Cable in Raceway Conduit Casing HDPE , Installation and Termination of I O User Side including I O punching,labelling and testing , Installation of Jack Panel including I O punching, labelling and testing , Installation of Face Plate and Gang Box including I O punching, labelling and testing , Trenching for outdoor UTP cables as per instructions including digging , Laying of HDPE pipes as per laying instructions for outdoor UTP cables including 32 40 mm HDPE pipe , Laying of Fibre Cable in HDPE pipes as per laying instructions including HDR drilling, HDPE pipe, fibre pulling, route markers, pits etc. , Digging the Concrete and Road Cutting , Supply and Installation 2 inch GI Pole for the Outdoor Access Point , Installation of Rack 32 15 9U , Installation of LIU including 26 Splicing , Installation of Switch , Installation of Access Point , Onsite Network Engineer for 5 Year Support , Construction of Huts as per design provided
Quantity 553651
|
| Tender Detail : |
Layer 2 Access Switch (V2),Lay...
Quantity: 553651 |