Product Detail :
|
Development of Chankya Centre for Excellence of MTDC Karla, Tal.Maval, Dist.Pune ,2.0 ,Dismantling brick masonry in lime or cement mortar and stacking the materils as directed with all leads, lifts etc. ,Dismantling stone masonry in lime or cement mortar including stacking the materils as directed with all leads, lifts etc. ,Removing lime or lean cement concrete including stacking the spoils as directed with all leads, lifts etc, complete. ,Removing rich mix cement concrete including stacking the spoils as directed with all leads, lifts etc, complete. ,Removing brick bat coba including stacking the spoils as directed with all leads, lifts etc, complete. ,Removing doors and windows with frames and stacking the materials as directed with all leads, lifts etc. complete. ,Removing ventilators and small windows with frame and stacking the materials with all leads, lifts etc. complete. ,Removing wooden or A.C. partition including frame work and stack-ing the materials as with all leads, lifts etc. complete. ,Removing cement tiles, or marble or polished shahabad floor or dado without bed concrete including stacking the materials as directed with all leads, lifts etc. complete ,Removing wire fencing with iron/ C.C. fencing post and stacking the materials as directed with all leads, lifts etc. complete. ,Removing earthen, stonewate pipe and stacking them as directed with all leads, lifts etc. complete. ,Dismantling the R.C.C. Work 124 and sorting out the materials such as steel etc. as directed and stacking them within the specified lead as directed etc. complete. ,Removing single country tiled roof with battens and stacking the materials as directed with all leads and lifts etc. complete. ,Removing purlins from roof including stacking as directed with all leads , lifts etc. complete. ,Removing rafters from roof including the materials as directed with all leads , lifts etc. complete. ,Removing urinal pans or wash hand basins with frame including disconnecting the sanitary and water supply connections, removing the same carefully and stacking the serviceable materials as and where directed including throwing the unserviceable materials outside etc complete ,Removing W.C. pans including disconnecting the sanitary and water supply connections, removing and breaking flooring and bed con-crete around pan removing the same carefully and stacking the serviceable materials as adn where directed including throwing the unserviceable materiasls out side etc. carefully and throwing out the refusal outside etc. complete. ,Removing Manglore tiled roof and ridge tiles with battens, ridge and barge boards, eaves 8 A boards etc and sacking the materials as directed with all leads and lifts complete. Including removing wood work below etc. complete. ,Removal of plants / ficus grown by pulling out root system embedded in masnory, cutting stem and application of high/gur/lime formulation as specified by the Architect or other patented chemical biocide treatment such as biocide 'Glycel' (iso proplamine salt of glyphosate) or other chemical as specified by the Engineer in charge etc. complete. ,Lowering down the debris obtained from breaking and removing the cement plaster / burnt brick masonry of the first floor by any means without causing dust nuisance and damage to structure, stacking the same as and where directed including cleaning the site complete. ,Removing G.I. or A.C. sheet roofing including purlins, principal rafters etc. including sorting serviceable and unserviceable materials, stacking the same as and where directed in the compound including scaffolding etc. complete. ,Removing and lowering the roof truss carefully without damaging the members and stacking as and where directed in the compound including scaffolding etc. complete. ,Removing paver blocks of any thickness etc in open passage, footpath, or any flooring laid on ground mechanically or manually and stacking materials and carting away unserviceable materials. ,Removing of existing kerb stone, cleaning off old mortar, carting away up to distance of 2 K.M and stacking the same as directedby the engineer. ,Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.5 m.) ,Excavation for foundation in earth, soils of all types, sand,gravel and soft murum, including removing the excavated material upto a distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift from 1.5m to 3.0m) By Mechanical Means ,Same as above for (Lift from 3.0m To 4.5 m.). By Mechanic
|
Tender Detail : |
Development of MICE Facility Centre (Chanakya Centre) at MTDC Karla premises Tal Maval Dist Pune #*. Development of MICE Facility Centre (Chanakya Centre) at MTDC Karla premises Tal Maval Dist Pune |