|
Product Detail :
|
DDSA Package-5 Kanjeta Pipero, DDSA Package-7 Bar and DDSA Pkg-9 Mandor Regional water supply scheme/s Comprehensive Operation and Maintenance of the project mainly Water Treatment Plant, different class, type and diameter pipes, pump houses, Sumps, RCC ESR, H.G.L.R, Sluice valves, Flow meters, non-return valve, Pump, motor, capacitor, L.T. Panels, L.T. cables and transformer installed at Headwork and Sub headwork. Work includes replacement of spares for all equipment and maintenance of all civil structures and all electro mechanical installation etc. complete. Including submission of periodic MIS reports on software. Supply of potable water in accordance, maintaining residual chlorine and all consumables including cost of chlorine and PAC. All type operations, preventive maintenance, overhauls and repair / break down maintenance for civil / mechanical & electrical works. Providing qualified and experienced staff for overall management of O&M work as per detailed specification & obligatory requirement for 60 months. Excluding electric power, raw water cost under DDSA Package-5 Kanjeta Pipero, DDSA Package-7 Bar and DDSA Pkg-9 Mandor Regional water supply scheme/s, Taluka Devgadh Baria, Limkheda, Dhanpur District Dahod
|