| Sector | abcCorporations/ Assoc/ Chambers/ Govt Agencies | Tender Value | INR 20.54 Crore | Location | Tamil Nadu - India | Ref.No | 86771801 | Closing Date | 15 - Sep - 2025 | | | CONSTRUCTION OF NEW BUS TERMINAL PROJECT AT T.S.NO.WARD.C, BLOCK.AT ARANTHANGI TOWN, PUTHUKKOTTAI DISTRICT, THANJAVUR REGION ,2.0 ,Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental of?cers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard speci?cation and as directed by the departmental of?cers.- Upto 2.40m Footing Depth. ,Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental of?cers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms at the site, etc., complete complying with standard speci?cation and as directed by the departmental of?cers. - From 2.40 - 3.30 Mts ,Re?lling with excavated earth other than sand with an initial head load of 100 mts. and depositing the earth as shown by the departmental of?cers in layers of not more than 15cm thick well rammed with surface vibrator, watered and consolidated etc., complete complying with standard speci?cation and as directed by the departmental of?cers. ,Supply and ?lling in foundation and basement with Gravel in layers of not more than 15cm.thick well rammed watered and compacted with surface vibrator, watered and consolidated etc. complete complying with standard speci?cation and as directed by the departmental of?cers. ,Supplying and providing Anti termite pre construction treatment using aldrin or dieldrin or heptachlor as per relevant IS 6313 (part II) code including cost of all materials, labour, hire charges for T&P etc complete. ,Supplying and ?lling in foundation, basement, etc with ?lling crushed stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard speci?cation and as directed by the departmental of?cers. ,Cement Concrete 1510 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard speci?cation and as directed by the departmental of?cers -Mixing by mechanical means ,Cement Concrete 136 (One Cement, Three crushed stone sand and Six broken stone jelly) using 20mm size hard broken stone jelly for dummy columns,etc., excluding cost of centering shuttering reinforcement grills and fabrication charges but including Cost of Mortar Plasticizer, curing etc. complete and as directed by the departmental of?cers. (Dummy columns should be at least 1 metre height)-Mixing by mechanical means ,Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid over silver oak joists of size 10cm x 6.5cm spaced at about 75cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specification. (Payment for centering shall be given after the concrete is laid) ,Supplying and erecting centering for sides and soffits including necessary supports and strutting ,Supplying and erecting centering for plane surfaces such as RCC Floor/Roof Beam, Lintels, Cantilever Beams, Bed Blocks etc.. with necessary supports and strutting upto 3.60m height in all ?oors with all cross bracings using MS Sheets made of 10 gauge thick welded with MS angle of Size 25mm x 25mm x 3mm for boarding laid over Steel adjustable Span of Size 2m x 2m(expandable upto 3.60m) and Silver Oak Joists of Size 10 x 5 cm spaced at 50cm to 60cm c/c and supported by Steel Adjustable Telescopic Props of Size 2m x 2m (expandable upto 3.60m) made with outer steel pipe with dia 50mm (3.60mm thick) and inner steel pipe with dia 40mm (2.90mm thick) Spaced at not more than 50 to 60cm c/c , etc complete complying with standard speci?cations. Steel adjustable span and Steel Adjustable telescopic props shall be provided as directed by the departmental Of?cers. (Payment for centering sha |
|
|
If you are a new user, then please
register, it's Free and then fill the form below.
If you are registered with us, just fill the form below, we will get back to you
shortly.
|
All fileds marked with '*' are compulsary.
|
|
|